Refresh (paint, hardware, counters, backsplash) starts around $18K. Cabinet + counter + tile + appliance replacement typically $45 - 70K. Full gut with layout changes $60 - 85K+.
Materials & appliances per mfr warranty.
What's included
- Demo of existing cabinets, counters, and flooring
- Cabinet install (stock, semi-custom, or client-supplied)
- Countertop templating + install coordination (quartz, granite, butcher block)
- Backsplash tile and grout
- Undermount / farmhouse sink and faucet install
- Under-cabinet lighting and outlet relocation (via licensed electrical sub)
- Appliance install and calibration
- Trim, paint, and punch-list walk-through
What we won't touch
If you need any of these, we'll refer you to a licensed specialist.
- Moving load-bearing walls (referred to a structural engineer + framer)
- Full re-pipe of the home (referred to a plumbing contractor)
- Panel upgrades over 200A
How the project runs
- 1Walkthrough & scope
Free 45-min in-home visit. We measure, photograph, and write the scope on the spot.
- 2Fixed written estimate
Line-item quote - labor, materials, subs, and allowance items separated. No verbal 'ballparks.'
- 3Selections & orders
We coordinate cabinet, counter, tile, and appliance orders with your selections locked in writing.
- 4Demo & rough-in
Protection floor-to-ceiling. Plumbing/electrical rough-in by vetted licensed trade partners we coordinate.
- 5Install & finish
Cabinets → counters → tile → paint → appliances → trim, in that order.
- 6Punch-list & warranty start
Walk-through, punch-list, cleanup. workmanship warranty begins the day you sign off.
Materials we spec
- • Semi-custom cabinets
- • Quartz counters
- • Ceramic + porcelain tile
- • Kohler / Delta fixtures
- • Under-cabinet LED
Permits
Plumbing and electrical rough-ins are pulled under the appropriate WA permits by the vetted licensed trade partners we coordinate.
Common questions
Both. Refreshes (paint, hardware, counters, backsplash) start around $18K. Full gut with layout changes runs $60 - 85K+.
Yes. Client-supplied items are noted in the written scope with install-only labor separated from material cost.
Plan for 3 - 7 weeks. We stage demo, cabinets, and counters so the sink and one appliance are usable most of that time.
Ready to price your kitchen remodel?
Free 45-minute walkthrough in Snohomish or King County. You leave with a fixed written scope.